Killiney Deep Retrofit & Extension
| EXTENSION: | Simple 24m2 box extension at ground floor |
| LAYOUT CHANGES: | Redesign ground floor layout for extended house Completely new first floor layout |
| RETROFIT WORKS: | Insulated ground floor between existing joists, Insulate external walls (dry lining), Roof insulation, Triple glazed windows and doors, Air tightness, Demand Controlled Ventilation system, Air-to-water heat pump, Central heating with aluminium radiators throughout, Heating controls, New plumbing, Rewiring, Energy efficient lighting. |
| FITTINGS AND FINSIHES: | Kitchen and utility room units including appliances, Bathroom fitouts, Wardrobes, Built in storage, Internal doors, Skirtings & architraves, Feature balustrade, Timber flooring, Tiling, Carpet, Light fittings, Painting and decorating. Side gate |
| STAGES 1 – 5: | 9 months |
| STAGE 6 (CONSTRUCTION): | 25 weeks |
Project details
Our clients on this job had young kids and a gorgeous family home before we were engaged. They had great taste and the décor and furnishings were very nice; it was a lovely family home. But it was cold like all older homes, and it was a bit small, especially considering that they needed to work from home occasionally. We were charged with modernising and reimaging their home, for them and with them.
Our clients were determined that the finished house would meet their practical needs which is expressed in the inclusion of plenty of storage. Everything was considered so that the completed house contained a space for everything, and the facility to work from home. Naturally the overall project budget was fixed so there were plenty of discussions about the pros and cons of various specification items and finishes to ensure they made the wisest decisions and wouldn’t have regrets.
The original house was full of our clients personality, so too is the finished home, especially with their furniture and belongings reinstalled.
This job was completed in a reasonably quick overall timeframe, and on budget. the overall project duration from first engagement to the handover was 15 months.