Monkstown Deep Retrofit & Redesign
| EXTENSION: | N/A – Apartment |
| LAYOUT CHANGES: | Minor changes at kitchen / living and entrance hallway. |
| RETROFIT WORKS: | Drylining external walls, Heating, Plumbing, Re-wiring, Low energy lighting, Air tightness, Ventilation |
| FITTINGS & FINISHES: | Layout changes, Kitchen, Appliances, Storage, Wardrobes, Flooring, Internal doors, Skirtings & architraves, Balcony, Painting and decorating |
| STAGES 1 – 5: | 9 months |
| STAGE 6: CONSTRUCTION | 14 weeks |
Project details
Our clients on this project had lived in this lovely apartment development for years. Their home was in lovely, but it had become dated and its insulation was poor by modern standards. They decided that it was time to carry out a complete renovation. After our initial meeting at the house we issued a budget estimate to notify the client of the order of cost involved in a complete renovation. This was in line with their expectation so we progressed to prepare a design proposal with specification and budget. We worked through design and specification options until we arrived at the optimum proposal for our client. We signed contracts and began to prepare for works on site. After a series of workshops we had the information we needed to finalise a set of construction drawings and a specification. Because everything was decided before the works started on site our clients were able to move abroad while we carried out the renovation. The project finished on budget and on time.